The area around the building is surrounded with a steel fence with a height of 1.40 m. Degree of completion of the building upon finishing of all contracted construction activities:
insulation and mineral plaster on all exterior walls
100% completion of all facades
PVC window-frames – soundproof and insulated
MDF interior doors
terraces and balconies – porcelain tiles on floors, handrails made from aluminum and glass
Water Supply and Sewage – made with polypropylene pipes
Electrical installation – the main electrical switchboard and all cable work leading to individual power switches and sockets, as well as all sockets, switches and ceiling lamps have been put in place
Weak-current installation – TV, intercom and cable TV
Walls and ceilings – lime stucco and plastering, and latex painting
Floors: living rooms and kitchen areas – porcelain tiles, bedrooms – laminate
Bathrooms – fully furnished: porcelain tiles on the floors, faience tiles on the walls, a toilet seat and a sink, a shower and a mixer tap, a fan vent, an electrical boiler
Infrastructure: electricity, water supply, sewage, parking, barbeque, projected improvements
Security systems
Upon request we can also deliver:
Kitchen furniture and appliances – sinks, mixer taps, cupboards, hoods, cookers, refrigerators, etc.
Furnishing of kitchens, living rooms and bedrooms.
Contract with a licensed security firm.
Contract with a cable TV supplier.
Note:
upon purchase of an apartment/studio an annual fee for servicing of all jointly-owned shares shall be discussed.